Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›SMS Avonmouth Completes Refit of Tarmac Hopper Dredger
Dredging

July 25, 2018 · about 8 years ago

SMS Avonmouth Completes Refit of Tarmac Hopper Dredger

SMS Avonmouth, part of the Southampton-based SMS Group, has completed a major refit alongside in Bristol Port for Tarmac, and relocated to larger premises to meet localized demand. The business has completed a major refit onboard the hopper dredger the City of Cardiff for Tarmac whilst simultaneousl

2 minutes read
  • LinkedIn
  • X
  • Email

SMS Avonmouth, part of the Southampton-based SMS Group, has completed a major refit alongside in Bristol Port for Tarmac, and relocated to larger premises to meet localized demand.

The business has completed a major refit onboard the hopper dredger the City of Cardiff for Tarmac whilst simultaneously relocating to a new, larger, footprint.

“ The City of Cardiff was built in 1997 and has been maintained to a high standard by Tarmac ever since; the refit was completed in a dedicated, controlled berth alongside in Bristol Port ,” SMS said in its release.

SMS took ownership of the site, to include permits-to-work and site security, as well as the program of repair works.

Access works included removing and repairing hatches to machinery spaces, arranging a scaffold staircase into the hold and fabrication of a walkway around the upper funnel.

“ SMS then U/T’d the cargo drainer sumps, overhauled the dredge pipe sliding piece and renewed the travelling discharge hopper. The company arranged scaffolding and U/T’d the discharger gantry thereafter repairing the discovered defects ,” they stated.

Works included renewing gland water pipework, repairing the discharger torque arm, assisting with the dredge pump service/overhaul, repairing the trunnion carriage, replacing the discharge grab closing winch drum and de-scaling the calorifiers and overhauling the associated valves and pipework.

A separate team overhauled the windlass brake, changed out the intermediate gantry hydraulic cylinder (with the pins and cheek plates renewed), changed out the drag head hydraulic cylinder with pins and renewed the cheek plate.

They installed new EMS cables and installed new energy chain cables. The company also load tested fixed lifting points, renewed bulkhead skirting in the accommodation and bridge, serviced the rescue boat outboard motor, renewed F/W filling pipework and valves, made paint repairs to ballast tanks and renewed the hydraulic.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnologyVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Methanol-ready energy subsea construction vessel arrives in Norway for completion
  2. 2Equinor employs 2009-built Odfjell Drilling rig for additional wells
  3. 3Nexans starts manufacturing 525 kV subsea cables for LanWin2 offshore wind grid connection
  4. 4More oil found at permit offshore Gabon

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free