Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›UK: Perenco hands in Tyne decommissioning plan
Fossil Energy

July 20, 2018 · about 8 years ago

UK: Perenco hands in Tyne decommissioning plan

Perenco has submitted its draft decommissioning program for Tyne South and Guinevere installation in the North Sea to the UK authorities.

2 minutes read
  • LinkedIn
  • X
  • Email

Oil and gas company Perenco has submitted its draft decommissioning program for Tyne South and Guinevere installations in the North Sea to the UK authorities.

According to Perenco’s draft decommissioning program submitted for consultation on Friday, July 20, Perenco plans to remove to shore the Tyne South topsides, jacket, and subsea installation for re-use or recycling.

The Tyne field was discovered by well 44/18-1 in 1992. Production started in November 1996. Due to reduction of gas production, continued operations were uneconomical and the field ceased production in November 2015.

The Tyne field is located in block 44/18a in the Southern North Sea approximately 188km off the coast of Norfolk and 184km off East Yorkshire. The Tyne platform was installed in 1996 and exports wet gas through a 20” line to the Trent Platform Mobile Offshore Application Barge (MOAB).

On Trent MOAB the gas is processed, water separated, cleaned up and discharged. After compression the gas is exported to Bacton on the Norfolk coast via the EAGLES pipeline system.

The Tyne platform is a Normally Unattended Installation (NUI) with maximum personnel on board (POB) of 12 and a temporary overnight shelter.

Before deciding to remove to shore the Tyne South topsides, jacket and subsea installation for re-use or recycling, Perenco assessed several options for the use of the platform including extending the producing life of the platform, utilizing it as an infrastructure hub for third party tie backs and enhanced recovery program, but none proved commercially viable.

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fatal rig incident: Search still underway for two missing workers off Gabon
  2. 2Planned wave energy project in India takes step forward
  3. 3CO2 storage appraisal campaign in UK North Sea yields positive results
  4. 4MOL and Deutsche ReGas shake hands on FSRU for German LNG terminal

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free