Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Fugro Wraps Up Saint-Nazaire Survey Campaign
Wind Farms

July 17, 2018 · about 8 years ago

Fugro Wraps Up Saint-Nazaire Survey Campaign

Fugro has completed a geotechnical survey campaign at the 480MW Saint-Nazaire offshore wind farm in France.

1 minutes read
  • LinkedIn
  • X
  • Email

Fugro has completed a geotechnical survey campaign at the 480MW Saint-Nazaire offshore wind farm in France.

This was the company’s second geotechnical campaign at the site some 12km offshore the Loire-Atlantique. It was carried out by the jack-up platform Excalibur and the Fugro Scout. The first campaign was performed in 2015.

Fugro has now completed the survey and the sampling of the soil in locations where 80 of the wind farm’s turbine foundations are planned to be installed.

The Saint-Nazaire wind farm comprises 80 6MW GE Haliade 150 turbines spread over an area of 78 square kilometres.

The owners and developers of the project are EDF Energies Nouvelles, a subsidiary of the EDF group, and Canada’s Enbridge Inc.

The commissioning of the wind farm is scheduled for 2022.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1More work with Petrobras increases Brazilian firm's backlog to over $2 billion
  2. 2Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  3. 3Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  4. 4Lamprell tasks IMI with offshore platform and jacket fabrication scope

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free