Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›ABB Power Pack for Hornsea Project Two SOV
Wind Farms

May 30, 2018 · about 8 years ago

ABB Power Pack for Hornsea Project Two SOV

Louis Dreyfus Armateurs (LDA) has awarded ABB with a contract to equip a wind farm service operation vessel (SOV) which once built will operate on the Hornsea Project Two offshore wind farm in the UK.

2 minutes read
  • LinkedIn
  • X
  • Email

Louis Dreyfus Armateurs (LDA) has awarded ABB with a contract to equip a wind farm service operation vessel (SOV) which once built will operate on the Hornsea Project Two offshore wind farm in the UK.

The ABB technology, with the power distribution system Onboard DC GridTM at its core, will allow integration of batteries to the 83-meter SOV’s hybrid power system.

Onboard DC GridTM enables integration of energy sources, such as batteries and fuel cells, and empowers the efficiencies associated with variable speed generator operation, ABB said.

In addition to Onboard DC GridTM, the ABB scope of supply includes tunnel thrusters, generators, transformers, batteries, ABB Ability™ Marine Advisory System – OCTOPUS and ABB’s Remote Diagnostics Services.

ABB will also provide its Power and Energy Management System (PEMS), which allows battery power to act as backup for running generators.

“LDA is positioning itself at the forefront of the wind farm service sector in vessel performance and efficiency,” says Hervé Lapierre , Head of Newbuilding Department at LDA.

“Wind farm service requirements are still evolving, meaning that SOVs built for this market, in addition to being cost-effective, need to also be innovative and flexible.”

Onboard DC GridTM solution enables variable speed technology to dynamically optimize system energy use in line with the load situation, which results in a 20% cut in fuel consumption, ABB said.

The vessel, designed by Salt Ship Design, will be built at Turkey’s Cemre Shipyard with the expected delivery in 2021. Like its predecessor, ordered in 2017 , the second LDA vessel will be on contract with Ørsted. The first SOV will also come equipped with the ABB kit.

“The second order from LDA feels like a validation of the performance, cost efficiency and safety that ABB delivers through its ‘Electric. Digital Connected’ approach, ” said Juha Koskela , Managing Director, ABB Marine & Ports.

The 1,386MW Hornsea Two will be built 89km from the Yorkshire coast and is scheduled for commissioning in 2022 when it will become the largest operating wind farm in the world.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsOperations & MaintenanceTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Shell to take a slice of Equinor's $10 billion oil project in Canada
  2. 2SLB and TotalEnergies enter into 15-year digital drilling agreement
  3. 3World’s first ammonia-powered dry bulk carrier ready for maiden voyage
  4. 4Weatherford expands its scope of work for Equinor

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free