Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Swansea Dredging Project Available for Comments
Dredging

May 15, 2018 · about 8 years ago

Swansea Dredging Project Available for Comments

The Town of Swansea is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with dredging in Swansea, Mass. Dredging is proposed in the Cole River and Mount Hope Bay in the waters adjacent to Ocean Grove Avenue at 458 Ocean

2 minutes read
  • LinkedIn
  • X
  • Email

The Town of Swansea is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with dredging in Swansea, Mass.

Dredging is proposed in the Cole River and Mount Hope Bay in the waters adjacent to Ocean Grove Avenue at 458 Ocean Grove Avenue in Swansea with the dredged material to be used for beach nourishment.

According to the Corps, the proposed work includes the maintenance dredging of approximately 5,950 cubic yards of sandy material by hydraulic means from a 5.69 acre area of the Cole River channel.

The proposed project also includes hydraulic dredging of two new areas for the purpose of navigational improvements and sand mining in order to supplement beach nourishment at the Town Beach.

This means dredging of the eastern shoal adjacent to the channel in Mount Hope Bay in order to mine sand for beach nourishment. Approximately 9,610 cubic yards of sandy material will be dredged from an approximately 2.65 acre area with varying depths, and dredging of the eastern shoal adjacent to the boat ramp within the Cole River.

Approximately 18,260 cubic yards of sandy material will be placed on 4.2 acres of the Town Beach as beach nourishment and approximately 100 cubic yards of material will be placed over a 3,000 square foot area in order to complete the dune restoration.

Deadline on sending public comments on the proposed work is June 14, 2018.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1In pursuit of Middle East expansion, US piping company sets up entity in Jordan
  2. 2Nordic energy players hit paydirt with new gas and condensate discovery
  3. 3TenneT and NKT jointly explore offshore cable decommissioning
  4. 4Methanol-ready energy subsea construction vessel arrives in Norway for completion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free