Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›FPSO›CHC transfers 15000 passengers to and from Prelude FLNG
FPSO

March 19, 2018 · about 8 years ago

CHC transfers 15000 passengers to and from Prelude FLNG

Offshore helicopter operator CHC Helicopter has transferred approximately 15,000 passengers to and from the world’s largest offshore facility – Shell Prelude FLNG – since its arrival to the Prelude field offshore Australia.

2 minutes read
  • LinkedIn
  • X
  • Email

Offshore helicopter operator CHC Helicopter has transferred approximately 15,000 passengers to and from the world’s largest offshore facility – Shell Prelude FLNG – since its arrival to the Prelude field offshore Australia.

CHC said that the transfers were made with the four S-92s helicopters racking up 2,782 flight hours and 171,080 nautical miles with no injuries or incidents.

Prelude is located 475km north-northeast of Broome and is in the process of being commissioned

Approximately 800 people are working and living on Prelude and the adjacent accommodation support vessel during this commissioning phase of the project.

“In the midst of all of this activity, the team in Broome have had to contend with two cyclones (hurricanes) and tropical lows which have dumped 1.5m (5ft) of rain on the coastal town and airport, where CHC has its base, in the last three months alone. That equates to more than two years’ worth of rainfall,” CHC said.

When it comes to Shell’s Prelude project, the 488-meter-long and 74-meter-wide floating facility is located Browse Basin, approximately 475km north-north east of Broome in Western Australia, secured with 16 mooring chains since August 2017. Prelude FLNG facility will stay at the location for 20 to 25 years.

The largest floating facility ever built will unlock new energy resources offshore and produce approximately 3.6 million tonnes of liquefied natural gas (LNG) per year. It will remain onsite during all weather events, having been designed to withstand a category 5 cyclone. Production from the Prelude field is expected to start later this year.

The Prelude FLNG project is operated by Shell in joint venture with Inpex (17.5%), KOGAS (10%) and OPIC (5%).

Offshore Energy Today Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

FPSOInfrastructure

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free