Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›DNV GL Wins Borssele 1 and 2 Project Certification Contract
Wind Farms

March 13, 2018 · about 8 years ago

DNV GL Wins Borssele 1 and 2 Project Certification Contract

Ørsted has awarded DNV GL Danmark A/S with a contract to provide project certification services and evaluate whether the assessment of the site conditions at the Borssele 1 and 2 offshore wind zone has been carried out and documented adequately.

2 minutes read
  • LinkedIn
  • X
  • Email

Ørsted has awarded DNV GL Danmark A/S with a contract to provide project certification services and evaluate whether the assessment of the site conditions at the Borssele 1 and 2 offshore wind zone has been carried out and documented adequately.

DNV GL will verify that the design basis is sufficient and adequately documented to ensure a safe design. The certification body will also evaluate that the site-specific loads and load effects are derived in conformity with the design basis, including an independent load analysis.

Furthermore, DNV GL will verify that the design of the support structures, including their bolted connections, complies with the applicable codes and standards, the design basis and the results of the ILA; and verify the interfaces between the Type Certificate, the ILA and the Support Structure Design Evaluation. All assessments will be evaluated in compliance with the IEC 61400-22.

Ørsted (formerly DONG Energy) won the concession rights to build Borssele 1 and 2 in the Dutch North Sea in July 2016. The project site is located 22km from the coast of the Dutch province of Zeeland. The wind farm will be built in water depths between 14 and 38 metres and will cover an area of 128.3km².

In July 2017, Ørsted and Siemens Gamesa signed an agreement for the supply and maintenance of 94 8MW turbines for the project, followed by the signing of a grid connection agreement with TenneT.

Borssele 1 & 2 is scheduled for commissioning by the end of 2020.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Shell to take a slice of Equinor's $10 billion oil project in Canada
  2. 2SLB and TotalEnergies enter into 15-year digital drilling agreement
  3. 3World’s first ammonia-powered dry bulk carrier ready for maiden voyage
  4. 4Weatherford expands its scope of work for Equinor

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free