Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Ramboll Wins Design Contract for New Port in Bangladesh
Dredging

January 17, 2018 · about 8 years ago

Ramboll Wins Design Contract for New Port in Bangladesh

In collaboration with local and international partners, Ramboll has been engaged to undertake a feasibility study and master plan for a new multi-purpose port in Bangladesh. The port will be central to a special economic zone being established in Mirasarai, north of Chittagong. The project involves

1 minutes read
  • LinkedIn
  • X
  • Email

In collaboration with local and international partners, Ramboll has been engaged to undertake a feasibility study and master plan for a new multi-purpose port in Bangladesh.

The port will be central to a special economic zone being established in Mirasarai, north of Chittagong.

The project involves wide-ranging environmental and traffic impact assessments, and economic feasibility studies as well as operational and port planning and the design of quay walls and breakwaters.

According to Ralph Bjørndal, Project Director in International Transport Studies at Ramboll , one of the main technical challenges of the project is its unique location. “ As this area is a flood plain, tons of sediment is washed up on a daily basis. This means that a significant part of our study will also concern a detailed analysis of the coastal hydraulic conditions, including sediment transport in the upstream river delta and the Feni-Mirasarai River. ”

The area is also prone to severe weather, particularly the cyclones that are prevalent along the coastline during the summer months. “ This puts unique demands on the infrastructure and means the port has to withstand tough conditions, and marine structures must be designed to prevent flooding and serious damage ,” added Bjørndal.

Valued at over 1.5 million EUR, the contract stipulates the possibility of continued cooperation for the next phase of the project, which includes the design and the establishment of the port.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem and Egypt’s MDC seal pact to target MENA offshore drilling market
  2. 2FEED job for Barents Sea FPSO topsides goes to Aibel
  3. 3Cook Inlet LNG steps up Alaska energy push with TDI-Brooks survey
  4. 4Nexans, Red Eléctrica to tie Mallorca and Menorca closer with new Balearic power link

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free