Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Sabella Completes D10 Turbine Export Cable Fix
Subsea

September 13, 2017 · about 9 years ago

Sabella Completes D10 Turbine Export Cable Fix

Sabella’s team has completed the replacement of a new dry mate connector at the end of the export cable connecting the D10 tidal turbine to Ushant’s coast. The operation was carried out with the MV Olympic Taurus, a multi-purpose vessel chartered by Mojo Maritime France (James Fisher Marine Services

1 minutes read
  • LinkedIn
  • X
  • Email

Sabella’s team has completed the replacement of a new dry mate connector at the end of the export cable connecting the D10 tidal turbine to Ushant’s coast.

The operation was carried out with the MV Olympic Taurus, a multi-purpose vessel chartered by Mojo Maritime France (James Fisher Marine Services).

The connector at the end of the export cable was damaged during the first deployment of the tidal turbine in June 2015, after a non-properly controlled sea operation carried out with a German installation vessel in the Fromveur Passage.

Despite the damages caused on the export cable, the tidal turbine was able to function correctly during the initial one-year authorization period.

The dry-mate connector was recovered in July 2016 by Mojo Maritime during the retrieval of the D10 turbine by the Norwegian vessel MV Aker Wayfarer. The export cable, equipped with a waterproof head cover, was then laid back on the seabed.

While D10 is undergoing maintenance and optimization works in Brest before a redeployment on her support structure, planned later this year, Sabella took advantage of favourable summer weather conditions to carry out marine operations for the cable, in order to minimize the duration of the upcoming turbine installation operations, the company said.

The MV Olympic Taurus kept her position on site for more than two days to complete the operation.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free