Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Dublin Port Maintenance Dredging About to Begin
Dredging

September 13, 2017 · about 9 years ago

Dublin Port Maintenance Dredging About to Begin

The Dublin Port Company (DPC) is about to begin the 2017 Maintenance Dredging of the port’s navigation channel and berthing pockets. According to the port, the dredging is expected to begin tomorrow, 14th September 2017, in order to re-establish the ruling depth of -7.8m Chart Datum. “The maintenanc

1 minutes read
  • LinkedIn
  • X
  • Email

The Dublin Port Company (DPC) is about to begin the 2017 Maintenance Dredging of the port’s navigation channel and berthing pockets.

According to the port, the dredging is expected to begin tomorrow, 14th September 2017, in order to re-establish the ruling depth of -7.8m Chart Datum.

“ The maintenance dredging campaign will be undertaken in accordance with the conditions as set out in the Foreshore License is AKC/2016/00262 granted by the Department of Environment, Communications & Local Government (DECLG ) and the Dumping at Sea Permit is S0004-01 granted by the Environmental Protection Agency (EPA) ,” reported the port.

DPC added that the international dredging company Boskalis has been appointed to undertake this maintenance dredging campaign. For the project, Boskalis will use its trailer suction hopper dredger SHOALWAY, similar to the one used in previous dredging projects.

The maintenance dredging campaign is expected to last for 2-4 weeks, during which approximately 1,000,000 tons of dredged sediment will be removed from the area.

The last dredging campaign was undertaken in 2016 but since then sediment has built up over time causing a reduction in the ruling depth in parts of the navigation channel and berthing pockets, thereby hampering day-to-day port operations, the port said.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rig incident: 110 rescued, 5 still missing after Borr Drilling’s jack-up sinks off Gabon coast
  2. 2Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  3. 3DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  4. 4Natural gas discovery springs up in India’s shallow waters

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free