Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Lloyd’s Register Supports Statoil’s Johan Sverdrup Development
Subsea

September 5, 2017 · about 9 years ago

Lloyd’s Register Supports Statoil’s Johan Sverdrup Development

Lloyd’s Register’s (LR) Risk Management Consulting team has signed a contract with Statoil to use LR’s expertise to conduct total risk analysis for the riser platform modification project at the Johan Sverdrup field which is forecast for production start-up in late 2019. Most of the front end engine

2 minutes read
  • LinkedIn
  • X
  • Email

Lloyd’s Register’s (LR) Risk Management Consulting team has signed a contract with Statoil to use LR’s expertise to conduct total risk analysis for the riser platform modification project at the Johan Sverdrup field which is forecast for production start-up in late 2019.

Most of the front end engineering design (FEED) work phase is being carried out by LR’s Bergen-based Risk Management Consulting team.

The Johan Sverdrup field development is a phased development. The first phase is underway and consists of a field centre comprising four platforms interconnected via bridges, plus three subsea water injection templates.

Also included in this first phase are export pipelines to existing infrastructure and power supplied from shore.

The second phase of the Johan Sverdrup, which LR’s team is contracted to work on, includes production capacity increase, tie-back of satellites, increased oil recovery (IOR) and an area solution for power from shore.

It comprises an extension of the field centre with an additional process platform, P2, placed on the east side of the RP and interconnected to the RP via a new bridge. An additional HVDC (high-voltage, direct current) system with power supply from shore will be installed as part of this phase.

The HVDC system will also supply power to third-party fields in the Utsira High area, namely Edvard Grieg, Ivar Aasen and Gina Krog.

Aker Solutions performed conceptual study work for this phase in 2016. The concept studies comprise tie-ins to existing platforms, i.e. detailing of RP, P1 and bridges modifications due to tie-in of the new process platform P2, as well as developing the conceptual design of P2.

Robert Nyiredy , European sales manager at LR’s Risk Management Consulting team, said: “This is a significant and important win for LR as this is one of the fifth largest development projects on the Norwegian Continental Shelf, and is one of the most important developments to be located in Norway over the next 50 years.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free