Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Ichthys LNG’s FPSO moored in Ichthys gas field (Video)
Clean Fuel

August 25, 2017 · about 9 years ago

Ichthys LNG’s FPSO moored in Ichthys gas field (Video)

Ichthys Venturer, the floating production, storage and offloading facility (FPSO) for the Inpex-operated Ichthys LNG project, has been moored in the Ichthys field, 220 kilometers off the north coast of Western Australia.

1 minutes read
  • LinkedIn
  • X
  • Email

Image courtesy of Inpex

Ichthys Venturer, the floating production, storage and offloading facility (FPSO) for the Inpex-operated Ichthys LNG project, has been moored in the Ichthys field, 220 kilometers off the north coast of Western Australia.

The 336-meter long FPSO will remain at its position for 40 years without dry dock.

Commenting on the mooring operation in the 250-meter deep waters of the Ichthys field, managing director of the Ichthys LNG project, Louis Bon , said it marks a significant milestone for the project.

During the mooring operation 21 pre-installed mooring chains, weighing more than 15,000 tons, have been connected from the seabed to the FPSO.

The FPSO has been designed to process and store most of the condensate delivered from the Ichthys LNG project’s central processing facility, Ichthys Explorer, moored some 3.5 kilometers away, before periodically offloading it to carriers for export to market.

“Ichthys Venturer has a storage capacity of 1.12 million barrels of condensate and will have a continuous operating life of 40 years,” Bon said adding the FPSO will undergo hook-up and commissioning to support the start-up of its operations.

The Ichthys LNG project is expected to produce up to 8.9 million tons of LNG per annum and 1.65 million tons of LPG per annum, along with approximately 100,000 barrels of condensate per day at peak.

Below is the video of the Ichthys Venturer moored in the Ichthys field.

document.createElement('video'); https://www.inpex.com.au/media/2989/fpso-in-the-field-august-2017-media-clip-preview-2-25082017mp4.mp4

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rig incident: 110 rescued, 5 still missing after Borr Drilling’s jack-up sinks off Gabon coast
  2. 2Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  3. 3DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  4. 4Natural gas discovery springs up in India’s shallow waters

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free