Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Caterpillar Supports Development of Ashdod Port
Dredging

June 28, 2017 · about 9 years ago

Caterpillar Supports Development of Ashdod Port

Caterpillar recently delivered the Cat 6015B OEM Frontless Hydraulic Shovel that is being used for the Ashdod Port Development Project in Israel. The port, located about 40 kilometers south of Tel Aviv, is undergoing a substantial expansion to meet the forecast of a 40 percent increase in cargo traf

2 minutes read
  • LinkedIn
  • X
  • Email

Caterpillar recently delivered the Cat 6015B OEM Frontless Hydraulic Shovel that is being used for the Ashdod Port Development Project in Israel.

The port, located about 40 kilometers south of Tel Aviv, is undergoing a substantial expansion to meet the forecast of a 40 percent increase in cargo traffic by 2021.

Known as the Cat 6015B OEM Long Reach Hydraulic Shovel and fitted with a custom-built, distinctive 30-meter boom attachment, it’s the result of cooperation between Caterpillar, Israel Tractor & Equipment (I.T.E.), Dutch company STC B.V. and PMEC in China.

According to Caterpillar, this sophisticated project has brought together a number of international companies that have created a uniquely advanced solution to dig deep below the water line.

“ This is an extraordinary project ,” said Rotem Bamani, Vice President of Projects with the Infrastructure Division for I.T.E. “ To succeed, we needed to understand the needs of PMEC as well as the complex transportation and assembly logistics. One aspect allowing full collaboration and trust was the positive customer experience PMEC had with us in the past. ”

Production of the hydraulic shovel took place in three locations. Engineering, production and assembly of the 30-meter boom was given to STC, along with a timeline of just five and a half months.

Meanwhile, the Caterpillar factory in Germany was preparing the 6015B body, which would be delivered frontless to STC before heading to Israel for final assembly at the worksite.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Weatherford expands its scope of work for Equinor
  2. 2Offshore installation starts at Valeura's Gulf of Thailand field ahead of schedule
  3. 3More work with Petrobras increases Brazilian firm's backlog to over $2 billion
  4. 4Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free