Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Singapore LNG in first small-scale reload
Clean Fuel

June 20, 2017 · about 9 years ago

Singapore LNG in first small-scale reload

Singapore LNG, the operator of the country’s first liquefied natural gas import terminal, has completed its first small-scale reload at its facility on Jurong Island. The gas-up/cool-down and reload operation was carried out from 18-20 June for Shell’s newly built LNG bunkering vessel Cardissa, Sing

2 minutes read
  • LinkedIn
  • X
  • Email

Singapore LNG, the operator of the country’s first liquefied natural gas import terminal, has completed its first small-scale reload at its facility on Jurong Island.

The gas-up/cool-down and reload operation was carried out from 18-20 June for Shell’s newly built LNG bunkering vessel Cardissa, Singapore LNG said in a statement.

As previously reported by LNG World News, the 6,500-cbm Cardissa left STX Offshore & Shipbuilding’s yard in South Korea earlier this month and it is on its way to the port of Rotterdam where it is expected to start operations this summer.

The Cardissa is one of Europe’s first LNG bunkering ships with Shell claiming it is the biggest seagoing vessel of its kind.

The fueling operation of the bunkering vessel was conducted at Singapore LNG terminal’s secondary jetty, which is originally designed to accommodate LNG vessels from 60,000 cbm to 265,000 cbm in size.

Singapore LNG said in its statement that compatibility studies were carried out in advance to ensure that the vessel could safely call at the jetty.

Prior to this, the smallest LNG carrier that had called at the Jurong LNG terminal for unloading or reloading was about 65,000 cbm in size.

“The successful completion of our first small scale LNG reload operation is significant as it demonstrates the SLNG terminal’s ability to play the role of LNG supply hub for the region,” said John Ng, Chief Executive of Singapore LNG.

The terminal is able to break LNG cargoes into smaller parcels and facilitate deliveries of small volumes of LNG to other terminals in the region, or as bunker fuel to ships in Singapore LNG’s port.

“We are already looking ahead to further enhance our capabilities in this area, by exploring possible modifications to our secondary jetty to accommodate LNG vessels as small as 2,000 cbm. This is expected to come onstream in 2019,” said John Ng.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rig incident: 110 rescued, 5 still missing after Borr Drilling’s jack-up sinks off Gabon coast
  2. 2Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  3. 3DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  4. 4Natural gas discovery springs up in India’s shallow waters

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free