Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›All Seasons Marina Dredging Plan on the Table
Dredging

June 9, 2017 · about 9 years ago

All Seasons Marina Dredging Plan on the Table

All Seasons Marina (within Neshaminy State Park) proposes to perform maintenance dredging, by hydraulic (cutterhead – pipeline) method, within an existing marina basin, the U.S. Army Corps of Engineers, Philadelphia District, announced. The applicant is seeking a 10- year maintenance permit, with an

1 minutes read
  • LinkedIn
  • X
  • Email

All Seasons Marina (within Neshaminy State Park) proposes to perform maintenance dredging, by hydraulic (cutterhead – pipeline) method, within an existing marina basin, the U.S. Army Corps of Engineers, Philadelphia District, announced.

The applicant is seeking a 10- year maintenance permit, with an initial dredging followed by up to three more dredging events over the ten years.

Under this plan , the initial dredging would remove a maximum of 21,000 cubic yards to a design depth of -4 feet at mean low water (MLW), with up to 2 feet of allowable over-dredge, for a maximum dredging depth of -6 feet (MLW).

The area initially proposed for dredging is approximately 2.73 acres out of the 13.9-acre basin.

With up to 21,000 cubic yards dredged in each follow-up maintenance event within the basin, the maximum volume to be dredged over 10 years would be 84,000 cubic yards.

The proposed disposal site is an existing 6.4-acre confined disposal facility (CDF) located on the property immediately to the east of the marina basin and parking lot.

Public comment deadline is on June 16, 2017, USACE said.

[mappress mapid=”24175″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1First-of-its-kind marine robotics test and development center opens in Norway
  2. 2Shell ups its production ante with first oil from US Gulf project’s third chapter
  3. 3Germany’s SEFE firms up two-decade-long offtake deal with Canadian LNG project
  4. 4Baker Hughes' subsea systems to help fast-track Cyprus's first commercial gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free