Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Beatrice Foundation Piles Falling Into Place
Wind Farms

May 25, 2017 · about 9 years ago

Beatrice Foundation Piles Falling Into Place

Almost 20 percent of piles for jacket foundations at the 588MW Beatrice offshore wind farm have been installed so far, Beatrice Offshore Windfarm Ltd (BOWL) reports.

1 minutes read
  • LinkedIn
  • X
  • Email

Almost 20 percent of piles for jacket foundations at the 588MW Beatrice offshore wind farm have been installed so far, Beatrice Offshore Windfarm Ltd (BOWL) reports.

In early April, Seaway Heavy Lifting’s Stanislav Yudin started installing the piles for the 84 turbine jacket foundations and the foundations for two offshore transmission modules at the site located approximately 13 kilometres off the Caithness coastline, Scotland.

The piles are being delivered by a cargo barge from the manufacturing site directly to the installation vessel at the offshore construction site.

According to BOWL’s Notice to Mariners, the piling works are scheduled to take place until the end of October.

Seaway Heavy Lifting, as of recently a wholly-owned subsidiary of Subsea 7 , won the EPCI contract for foundations and array cables jointly with its now mother company.

The two companies are in charge of project management, designing, engineering, fabricating and installing jacket foundations and array cables for 84 Siemens 7MW wind turbines, as well as transporting and installing the offshore transmission modules.

The 588MW wind farm – developed by a joint venture partnership between SSE (40%), Copenhagen Infrastructure Partners (35%) and Red Rock Power Ltd. (25%) – is expected to become fully operational in 2019.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Venture Global and ConocoPhillips play the long game with 20-year LNG pact
  2. 2Egypt and Chevron seal Mediterranean oil & gas exploration deal
  3. 3Subsea battery system for offshore wind completes test before deployment
  4. 4$125M purchase: New owner to take over 178-meter subsea vessel next October

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free