Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Conley Container Terminal Development Plans Introduced
Dredging

March 29, 2017 · about 9 years ago

Conley Container Terminal Development Plans Introduced

The Massachusetts Port Authority (Massport) has submitted an application to perform work in the Reserved Channel at the Conley Container Terminal in South Boston, the U.S. Army Corps of Engineers, New England District, just announced. The project involves constructing a new wharf and establish two d

1 minutes read
  • LinkedIn
  • X
  • Email

The Massachusetts Port Authority (Massport) has submitted an application to perform work in the Reserved Channel at the Conley Container Terminal in South Boston, the U.S. Army Corps of Engineers, New England District, just announced.

The project involves constructing a new wharf and establish two deep-water berths at the Conley Container Terminal with minimum depths of at least 50 feet mean lower low water (MLLW) that can support larger container vessels.

This development scheme also includes removing the maritime facilities associated with the former Coastal Oil terminal property, installing a new 1,278 linear foot pile-supported concrete wharf at Berth 10 and mechanically dredging 175-foot wide slips at Berths 10 and 11 to a depth of -50 feet MLLW plus dedicated overdredge.

Massport estimates that there could be approximately an additional 8,500 cubic yards of rock removal and this may require blasting operations. Approximately 912 steel piles will be installed as part of the construction of the Berth 10 wharf, USACE said.

The deadline for submitting the comments for this project is April 28, 2017.

[mappress mapid=”23824″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free