Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›Bi-radial turbine for wave project enters final assembly stage
Marine Energy

February 3, 2017 · about 9 years ago

Bi-radial turbine for wave project enters final assembly stage

The bi-radial turbine to be used for the EU-funded wave energy cost reduction project dubbed OPERA has entered the final assembly stage.

2 minutes read
  • LinkedIn
  • X
  • Email

The bi-radial turbine to be used for the EU-funded wave energy cost reduction project dubbed OPERA has entered the final assembly stage.

Following the completion of the assembly process, the bi-radial turbine will head for power take-off (PTO) dry-testing at the turbo machinery laboratory in IST.

The turbine is supplied by Kymaner, part of 12-member consortium participating in the Open Sea Wave Operating Experience to Reduce Energy Cost (OPERA) project.

The bi-radial turbine-generator set aims to increase oscillating water column (OWC) annual mean efficiency by 50% and improve the reliability of the PTO in comparison with the most frequently used options.

One of the key components of this novel turbine is the High Speed Safety Valve (HSSV), integrated in the structure and capable of performing the dual function of latching control and safety, protecting the turbine from being damaged by over speeding, in case of stormy conditions at sea, according to OPERA project website.

After the dry PTO testing, the open sea validation of the Kymaner’s bi-radial turbine will be conducted in the Mutriku wave power plant, and later this year at the Biscay Marine Energy Platform (Bimep), both located in the Spanish Basque Country.

As reported earlier, Marmok-A5 device – a point absorber OWC wave energy converter developed by the Oceantec Energías Marinas, was installed at Bimep as part of the OPERA project.

The device generates power when the waves cause water column to rise and fall, compressing and decompressing the air above, which spins the turbines to drive an electricity generator.

Project OPERA aims to develop a technology that would reduce the cost of operating wave energy devices at sea for 50%, accelerate the development of international standards and reduce uncertainties and technological risks.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergyBusiness & FinanceOperations & MaintenanceResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Venture Global and ConocoPhillips play the long game with 20-year LNG pact
  2. 2Egypt and Chevron seal Mediterranean oil & gas exploration deal
  3. 3Subsea battery system for offshore wind completes test before deployment
  4. 4$125M purchase: New owner to take over 178-meter subsea vessel next October

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free