Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Mouse River Flood Protection Project on Display
Dredging

December 7, 2016 · about 10 years ago

Mouse River Flood Protection Project on Display

The City of Minot will next week host a public meeting on the Mouse River Enhanced Flood Protection Project draft Programmatic Environmental Impact Statement. The meeting, organized by the U.S. Army Corps of Engineers, St. Paul District and the Souris River Joint Water Resource Board (SRJB), will be

1 minutes read
  • LinkedIn
  • X
  • Email

The City of Minot will next week host a public meeting on the Mouse River Enhanced Flood Protection Project draft Programmatic Environmental Impact Statement.

The meeting, organized by the U.S. Army Corps of Engineers, St. Paul District and the Souris River Joint Water Resource Board (SRJB), will be held December 15 in room 201 at the Minot Auditorium.

According to the Mouse River Plan, the SRJB is proposing to construct the first segments of a flood damage reduction project in the corridor that would include building approximately 18.9 miles of levees and 2.7 miles of floodwall.

The plan also includes, among other things, the building of 21 transportation closure structures, 23 storm water pump stations and associated ponding areas and the reconstruction or modification of six bridges. The project is designed to pass flows up to 27,400 cubic feet per second.

The SRJB submitted a request to the Corps to make alterations to the federal flood damage reduction project in Minot in order to begin construction on the first three segments of the Mouse River Plan.

As a requirement of this request, a draft programmatic EIS has been developed to assess impacts that may be caused by the project.

Public input provided at these meetings will be used to assist in preparing the final programmatic EIS in accordance with the National Environmental Policy Act, or NEPA.

[mappress mapid=”23339″]

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free