Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Grab Hopper ‘Dredger-1’ Ready for the Action
Dredging

April 21, 2016 · about 10 years ago

Grab Hopper ‘Dredger-1’ Ready for the Action

In mid-April of 2016, the Indian Navy’s grab hopper dredger, Dredger-1 was preparing to depart its birth shipyard following a comprehensive one-year warrantee review. Tebma Shipyards Senior Vice President, M. Balasubramaniam, explained that the 44.15 by 12.2-meter vessel was designed to meet precise

1 minutes read
  • LinkedIn
  • X
  • Email

In mid-April of 2016, the Indian Navy’s grab hopper dredger, Dredger-1 was preparing to depart its birth shipyard following a comprehensive one-year warrantee review.

Tebma Shipyards Senior Vice President, M. Balasubramaniam, explained that the 44.15 by 12.2-meter vessel was designed to meet precise deepening requirements around docks and port installations and in riverine or other places where deepening of specific areas is required.

The vessel has a 320-HP Cummins-855-powered forward-mounted crane supplied by Titagarth Wagons. The crane’s 15.2-meter boom has a working radius of 12 meters and hoisting capacity of 10.5 tonnes at a 46-degree boom angle.

The crane’s grab bucket has a 3-cubic meter capacity to hold 4.5 tonnes of dredge materials. The crane is capable of dredging in depths up to ten meters. The crane transfers the dredged material to the ship’s hopper which is of 300 cubic meter capacity, (500 tonnes).

The dredged material in the hopper id dumped at open through a set of eight hopper doors controlled by hydraulic rams and chains over pulleys.

The main propulsion for the dredger is a pair of Cummins KTA38-M engines each producing 1000 HP at 1800 RPM. These engines are built in India and meet the Indian Navy’s policy of supporting domestic suppliers.

With the one-year warrantee review completed, the Dredger-1, has left the Tebma Shipyard and will resume duties with the Indian Navy at Naval Dockyard, Mumbai.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1EU backs cross-border CO2 transport and storage project with €223 million
  2. 2Timor-Leste throws 12-month lifeline to delayed gas project ahead of drilling ops
  3. 3WATCH: Second Island Offshore ocean energy construction vessel in Norway for completion
  4. 4United Oil & Gas eyes billion-barrel Jamaican drilling targets as it maps out next steps

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free