Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›VIDEO: Damen DOP Dredger Working in Peru
Dredging

April 12, 2016 · about 10 years ago

VIDEO: Damen DOP Dredger Working in Peru

Reservoirs are notoriously tricky to maintain: from the surrounding area plenty of sand and silt is brought in by the river and the material deposits at the dam. As reservoirs are usually rather deep, dredging can be quite a challenge. For the Tablachaca dam in Peru another challenge was added; the

1 minutes read
  • LinkedIn
  • X
  • Email

Reservoirs are notoriously tricky to maintain: from the surrounding area plenty of sand and silt is brought in by the river and the material deposits at the dam. As reservoirs are usually rather deep, dredging can be quite a challenge.

For the Tablachaca dam in Peru another challenge was added; the location high up in the Andes required a modular dredger due to transport restrictions.

For this challenging task, Damen recently delivered its DOP dredging package to the area.

The set included a DOP350L dredge pump which has a mixture pumping capacity of 2.400 m3/h as well as the diesel hydraulic power pack which drives the DOP submersible dredge pump, plus the hoisting winch.

This winch enables the DOP submersible dredge pump to be lowered on a cable to a dredging depth of -35 m. Moreover, a jetwater pump unit was delivered for supplying the DOP’s suction head with pressurized water.

The modularly constructed DOP dredger furthermore included a standard Damen operator cabin, an A-frame for lowering the DOP pump plus the wires and sheaves to do so, as well as dredging instrumentation.

On deck, a separate unit is located housing flow and density meter, which gives the operator a clear view of the dredging process.

The DOP dredger 350L was commissioned in February by Damen Field Service Engineers.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnologyVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Folegandros island joins Greece’s mainland power grid via 60-kilometer subsea cable
  2. 2UK’s first HVDC subsea cable factory opens in Scotland
  3. 3EU grant to cover 60% of investment for 10 MW tidal kite array in Ireland
  4. 4Eni and Libya’s National Oil Corporation turning on the taps at African gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free