Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Wartsila tech ordered for BC Ferries vessels LNG conversion
Clean Fuel

April 11, 2016 · about 10 years ago

Wartsila tech ordered for BC Ferries vessels LNG conversion

Wärtsilä of Finland said its technology has been ordered by the Gdańsk Shiprepair Yard Remontowa for the $140 million mid-life upgrade and LNG conversion of BC Ferries’ two RoPax vessels.

1 minutes read
  • LinkedIn
  • X
  • Email

Wärtsilä of Finland said its technology has been ordered by the Gdańsk Shiprepair Yard Remontowa for the $140 million mid-life upgrade and LNG conversion of BC Ferries’ two RoPax vessels.

Under the contract signed in March, Wärtsilä’s supply includes four Wärtsilä 34DF dual-fuel engines with fuel gas systems, integrated automation systems and power management systems, a statement on Monday reveals.

Additionally, the order includes the propulsion control system, the power transmission systems comprising two gearboxes, the Wärtsilä LNGPac comprising the fuel storage tank, bunkering station, gas detection system and process control automation, rudders, site representation and integration engineering, and crew training.

The upgrading work on the two Spirit-Class vessels, the Spirit of British Columbia and the Spirit of Vancouver Island, is scheduled for fall of 2017 and the fall of 2018.

Wärtsilä’s equipment will be delivered to the Remontowa shipyard in mid-2017 and mid-2018, prior to the arrival of the vessels.

Upgrading works include surveying the stern tube and renewing components, surveying and overhauling the controllable pitch propeller (CPP) hubs, redesigning and renewing the CPP propeller blades, surveying, renewing and overhauling the oil distribution boxes, and renewing two bow thrusters and E motors, Wärtsilä added.

The vessels are scheduled for completion in the spring of 2018, for the 1993-built Spirit of British Columbia and the spring of 2019 for the 1994-built Spirit of Vancouver Island.

LNG World News Staff

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelEquipmentProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1UK’s first HVDC subsea cable factory opens in Scotland
  2. 2EU grant to cover 60% of investment for 10 MW tidal kite array in Ireland
  3. 3Eni and Libya’s National Oil Corporation turning on the taps at African gas project
  4. 4Transocean’s drillship pair bags $550 million in new US Gulf deals

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free