Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›EPN and INTUR Order Damen Cutter Suction Dredger
Dredging

February 19, 2016 · about 10 years ago

EPN and INTUR Order Damen Cutter Suction Dredger

A contract has been signed by EPN, the Nicaraguan Port Authority, and INTUR, the Nicaraguan Tourist Agency, with the Damen Shipyards Group for the delivery of a CSD350 Cutter Suction Dredger. The dredger is to be operated by EPN on a project to create and maintain a 200 km inland channel running alo

2 minutes read
  • LinkedIn
  • X
  • Email

A contract has been signed by EPN, the Nicaraguan Port Authority, and INTUR, the Nicaraguan Tourist Agency, with the Damen Shipyards Group for the delivery of a CSD350 Cutter Suction Dredger.

The dredger is to be operated by EPN on a project to create and maintain a 200 km inland channel running along a section of Nicaragua’s Caribbean coast.

This is the first Damen CSD to be purchased by INTUR, and is designed for heavy-duty operations with a production capacity of 2000 mᶟ/h to a depth of nine meters.

The CSD350 will be the fourth vessel delivered to EPN over the past year; with a Stan Tug 2608, another CSD350 and a CSD250 all recently beginning operations in Nicaragua.

The CSD350 will be deployed on an ambitious project to create a continuous 200 km channel running parallel to the sea between Bluefields and Bilwi, connecting the north and the south of the country.

The existing waterway is a mix of rivers, lakes and some manmade channels running through lagoons and mangrove swamps.

However, the rivers and lakes require dredging and the channels need to be completed. In addition, midway along the channel near Karawala, a completely new waterway of around 22 km will be created to link the northern and southern sections.

Once completed, the new channel will enable larger and more comfortable boats to use the route and so encourage the local tourism industry.

The vessel is scheduled to arrive in Nicaragua at the beginning of April, equipped with all the necessary equipment, including a 1000 meter pipeline, to operate in this very remote area.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentProject & TendersTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free