Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›GMax Working on Tidal Energy Device Prototype
Offshore Wind

August 5, 2015 · about 11 years ago

GMax Working on Tidal Energy Device Prototype

A lab-sized prototype of GMax Tidal Energy’s device is now 90% completed, the U.S. company informed today. The twin engine machine, driven by ocean water currents will be able to generate 1.5 MW of power. Set upon a floating stage platform, no foundations or contact with the ocean floor is required.

1 minutes read
  • LinkedIn
  • X
  • Email

A lab-sized prototype of GMax Tidal Energy’s device is now 90% completed, the U.S. company informed today.

The twin engine machine, driven by ocean water currents will be able to generate 1.5 MW of power.

Set upon a floating stage platform, no foundations or contact with the ocean floor is required. All maintenance is performed top side, with a lift ensemble and carousel design to accept water currents from both directions. Power is generated 16 hours per day, GMax said.

The technology is based on linear flow, a method designed to capture a moving mass of water, then converting the energy into electricity.

Each modular unit is designed using a floating stage method and can be scaled up to 3 MW of electricity. A scalable design can include permanent modular units, temporary power units, or customizable options.

“GMax Power Place is not a turbine. Units can be built depending upon the area, budget, or capacity of electricity required,” the company pointed out.

Modular configurations, with numerous in-line units, can be constructed for larger scale GMax Power Place locations.

There are 2 GMax Carbon Free Engines per modular unit. These engines are supported by a connecting structure upon a deck which activates vertically, rotund, and horizontially.

Source: GMax Tidal Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindResearch & DevelopmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1First-of-its-kind marine robotics test and development center opens in Norway
  2. 2Shell ups its production ante with first oil from US Gulf project’s third chapter
  3. 3Germany’s SEFE firms up two-decade-long offtake deal with Canadian LNG project
  4. 4Baker Hughes' subsea systems to help fast-track Cyprus's first commercial gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free