Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Shipping of the Dredger
Dredging

May 21, 2015 · about 11 years ago

Shipping of the Dredger

First Global Logistics and Europe Cargo, both members of Project Cargo Network, have recently collaborated on the project cargo shipment of a dredger and its equipment from Alexandria to Antwerp. The dredger had finished its work at Sokhna Port and all the parts and equipment had to be shipped back

1 minutes read
  • LinkedIn
  • X
  • Email

First Global Logistics and Europe Cargo, both members of Project Cargo Network, have recently collaborated on the project cargo shipment of a dredger and its equipment from Alexandria to Antwerp.

The dredger had finished its work at Sokhna Port and all the parts and equipment had to be shipped back to its final destination.

The project was divided into 2 jobs performed simultaneously in different ports of loading which was not an easy task.

The 1st job (via Grimaldi) took place at Alexandria Port and involved two buckets with dimensions of 4 x 4.7 x 3.4m (38,000kgs) and 3.8 x 4.6 x 2.7m (29,000kgs). The team at Alexandria port handled the lashing and securing of the cargo, wood fumigation and all operations and port handling.

The 2nd job (via Hamburg-Sud) took place at Dekheila port and involved: 2 Boom Cylinders (19,200kgs, 6.5 x 0.7m each); 8 Bucket Teeth (650kgs each); 1 Guiding Sheave (19,950kgs, 1.2 x 0.2m); and 1 Stick Cylinder (15,500kgs, 5 x 0.5m).

The cargo was loaded from low-bed trailers into 3 x 40′ open-top containers. The team at Dekheila Port handled the stuffing, lashing and securing of the cargo, fumigation inside the port and all operations and port handling.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnologyVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Minesto reports 'record' 48-hour service intervention on its tidal power plant
  2. 2Rig provider and other contractors revealed for Timor-Leste's oil field
  3. 3Subsea7 contracts Worley for Northern Lights' key subsea structures
  4. 4Ofgem to launch record tender looking for owner of Hornsea 3 offshore transmission assets

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free