Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›DSC Dredge Contributes to Gulf Coast Project
Dredging

April 30, 2015 · about 11 years ago

DSC Dredge Contributes to Gulf Coast Project

J.E. Borries Inc., a full-service marine construction and dredging company based on the Mississippi Gulf Coast, recently took delivery of an 8-inch Badger Class dredge by DSC Dredge, LLC. Prior to this dredge purchase, J.E. Borries had completed all of its dredging work by mechanical means, using a

2 minutes read
  • LinkedIn
  • X
  • Email

J.E. Borries Inc., a full-service marine construction and dredging company based on the Mississippi Gulf Coast, recently took delivery of an 8-inch Badger Class dredge by DSC Dredge, LLC.

Prior to this dredge purchase, J.E. Borries had completed all of its dredging work by mechanical means, using a long-reach excavator or a clamshell friction crane.

Barrier island reconstruction is an ongoing effort along this section of the Mississippi coast following the siltation that occurred during Hurricane Isaac in 2012.

The company recently was awarded a project by the Mississippi Department of Marine Resources to complete the dredging of three bayous in and around Gulfport, Mississippi. A change in the plans and specifications for the project necessitated the combined use of both hydraulic and mechanical dredging.

Known as the “SUDS” project, the dredging of the Stark, Upper Davis and Simmons bayous includes initial mechanical excavation, with the fines being deposited into a 200-cubic-yard shallow-draft barge, which transports the material to Deere Island, a barrier island in close proximity to Gulfport. The material comprises sandy silt with minor amounts of “gumbo” clay (sticky black, gray or green-colored clay) and shells.

After reaching Deere Island, the spoils are offloaded into a holding cell and then deepened and turned by the Badger Dredge, which re-excavates the material and pumps it approximately 2,000 feet away. The dredge depth obtainable to the natural hard sand bottom in the holding cell is 9-feet-plus. By the end of the project, approximately 170,000 cubic yards of material will be deposited on the island for use as fill.

The Badger Class 8” x 8” Cutterhead Dredge is manufactured by DSC at its Greenbush, Michigan, facility. It is ideal for smaller dredging jobs where more compact equipment is required due to work area limitations.

With a working width of just under 10 feet and an overall length of 54 feet including the ladder, the Badger Class dredge can be maneuvered by dredging contractors into harder-to-reach waterways not accessible by larger crafts, yet it still can dig to a depth of 20 feet at a 60-degree down angle on the ladder.

The lateral cut achieved by the Badger Class dredge at maximum depth is approximately 50 feet. The Badger Class dredge is 9 feet, 2 inches tall and can be transported on a single truckload.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnologyVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ofgem to launch record tender looking for owner of Hornsea 3 offshore transmission assets
  2. 2Seascape Energy gets 45% more offshore acreage in Malaysia
  3. 3TMC Compressors returns 20 years later to equip FPSO for new life in Brazil
  4. 4Houston-based subsea services provider finds local partner in Brazil

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free