Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Italdraghe: Another Marina Master for UK
Dredging

March 27, 2015 · about 11 years ago

Italdraghe: Another Marina Master for UK

Italdraghe SpA, Italy’s best known dredger manufacturer, has just been awarded a contract to build another Marina Master 8000 dredger for the United Kingdom. This will be the second dredger of its kind to be supplied to a UK marina owner requiring versatile, easily-manoeuvrable, precision dredging e

1 minutes read
  • LinkedIn
  • X
  • Email

Italdraghe SpA, Italy’s best known dredger manufacturer, has just been awarded a contract to build another Marina Master 8000 dredger for the United Kingdom.

This will be the second dredger of its kind to be supplied to a UK marina owner requiring versatile, easily-manoeuvrable, precision dredging equipment.

A key feature of the dredger will be its horizontally-hinged dredging arm that will be manufactured in two sections with a central hydraulic-controlled vertical hinge, allowing the dredger to work under floating marina pontoons and finger piers without having to remove them.

Thanks to its ability to manoeuvre into and clean individual berths and then reverse out, there is no need for the marina owner to empty out the entire marina prior to starting dredging operations. Only one or two moored boats will need to be temporarily moved out at a time and, as each berth is dredged, these boats can be moored back into place as the dredger moves on to the next berth.

Dredging can thus be done throughout the year, even in the busier summer months.

The 14-meter long self-propelled dredger, with a PD180 dredging pump, will be built in the Italdraghe shipyard on Italy’s Adriatic Coast.

Compared to its predecessor, the Marina Master MK II will have a number of special additional features including enhanced alarm systems and hydraulically-operate sponsons.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnologyVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1JERA deepens Australian LNG foothold with larger stake in Chevron’s project
  2. 2MoU charts the path for tidal and ocean current energy projects in Chile
  3. 3Seadrill hit with $55 million bill after appeals court upholds rig breach ruling
  4. 4Sunda steps closer to dusting off 1985 gas field as New Zealand bid goes exclusive

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free