Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Dudgeon OWF’s SOV to Use Uptime’s Walk-to-Work System
Wind Farms

January 19, 2015 · about 11 years ago

Dudgeon OWF’s SOV to Use Uptime’s Walk-to-Work System

Uptime International has entered into contract with ESVAGT AS for the delivery of an active motion compensated gangway including an adjustable pedestal. The walk-to-work system will be mounted during early 2016 on their wind turbine service operation vessel (SOV). This is the first dedicated wind fa

1 minutes read
  • LinkedIn
  • X
  • Email

Uptime International has entered into contract with ESVAGT AS for the delivery of an active motion compensated gangway including an adjustable pedestal.

The walk-to-work system will be mounted during early 2016 on their wind turbine service operation vessel (SOV).

This is the first dedicated wind farm vessel with an adjustable pedestal, which enables the walk-to-work system to land at several heights with a high operability.

The vessel is designed by Havyard and is chartered by Statoil to do service operations at the Dudgeon Offshore Wind Farm.

Dudgeon is the first offshore wind farm in the UK that will be using an SOV including an active motion compensated walk-to-work system.

“We have been working hard to develop solutions that reduce costs, and increases uptime and safety for wind farms. It is a vote of confidence and gives us a trigger to stretch for even further development when we enter into contracts with forefront shipowners like ESVAGT.

“We are also very pleased that major companies like Statoil, Statkraft and Masdar are choosing Uptime walk to work system as the preferred solution for wind farms,” says Sales & Marketing Director Svein Ove Haugen .

Press release; Image: Uptime International

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Connecting the offshore energy industry through smarter travel
  2. 2Borr Drilling’s rig trio lines up jobs in Africa and Europe
  3. 3Inpex broadens its Southeast Asian horizons with two offshore blocks
  4. 4Dutch LNG terminal capacity rises to 20 billion cubic meters with 4th tank

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free