Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›APSI reaches milestones in LNG-ready product tankers construction
Clean Fuel

December 24, 2014 · about 11 years ago

APSI reaches milestones in LNG-ready product tankers construction

Aker Philadelphia Shipyard held a keel laying ceremony for the second and began construction on its fourth LNG-ready product tanker for the JV with Crowley.

2 minutes read
  • LinkedIn
  • X
  • Email

Aker Philadelphia Shipyard, the wholly-owned U.S. subsidiary of Aker Philadelphia Shipyard ASA, celebrated two significant ship milestones this week.

The shipyard held a ceremonial Keel Laying for the second of four product tankers that it is building for its joint venture with Crowley and the construction began on its fourth product tanker in the same series.

At the Keel Laying ceremony, coins were placed on one of the keel blocks before the 580 ton unit, which will be part engine room of the completed ship, was lowered into place in the dry dock. This tradition dates back to early shipbuilding and signifies good fortune and safe travels. Representatives from APSI and Crowley were in attendance to place the coins and sign the keel block.

Representatives from both companies gathered in the Fabrication Shop to begin cutting the first plate of the fourth product tanker in the series. That plate will become part of the double hull of the tanker that protects the cargo tanks. When completed in 2015 and 2016, these vessels will be 600 feet long and be capable of carrying 50,000 tons of crude oil or refined petroleum products.

The new 50,000 dwt product tankers are based on a proven Hyundai Mipo Dockyards design which incorporates numerous fuel efficiency features, flexible cargo capability, and the latest regulatory requirements. The vessels will be constructed with consideration for the use of LNG for propulsion in the future.

[mappress mapid=”16335″]

Press Release; Image: Aker Philadelphia Shipyard

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1New wind for hydrogen-electric shipping as GMI-PowerCell collaboration expands to four bulk carriers
  2. 2AI, next-gen tech, and maritime decarbonization on RINA- China Merchants Energy Shipping pact’s agenda
  3. 3Ørsted expands offshore wind ROV fleet with third Saab electric subsea robot
  4. 4ADNOC broadens its Asian horizons with Gulf Group LNG deal

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free