Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Marine Energy›WaveRoller™ cleared for next installation
Marine Energy

December 8, 2014 · about 11 years ago

WaveRoller™ cleared for next installation

The WaveRoller™ Pilot Power Plant, that was recently brought to harbor after campaign in Portugal, has now been thoroughly inspected and cleared for the next installation by experts from Lloyd’s Register. The inspection was carried out as a part of the cooperation between AW-Energy and Lloyd’s Regis

2 minutes read
  • LinkedIn
  • X
  • Email

The WaveRoller™ Pilot Power Plant, that was recently brought to harbor after campaign in Portugal, has now been thoroughly inspected and cleared for the next installation by experts from Lloyd’s Register.

The inspection was carried out as a part of the cooperation between AW-Energy and Lloyd’s Register, with the aim to get a certification for the WaveRoller technology in the near future.

The sea trials were held in very demanding sea conditions, with significant wave heights of more than 8 meters. The aim of this specific campaign was to collect load case data on various parts of the device with a focus on the panel.

The report states that the device is in very good condition and that the panel was in original condition and neither cracking nor breaking was found. After inspection the WaveRoller is ready for the next installation and operation can be continued.

WaveRoller is one of the most promising solutions in the emerging nearshore wave energy industry, with several projects initiating in Portugal, France, Ireland and Chile.

Commercial roll-out of the WaveRoller™ technology is proceeding according to plans. The first device is scheduled to be installed in Portugal in the second half of 2015.

AW-Energy’s CEO, John Liljelund says: “All grid-connected sea trials during the past two years, with independently validated results on both performance and durability, prove the feasibility and viability of the WaveRoller technology and the nearshore wave energy solutions in general. We feel confident to scale up the unit size.”

“Lloyd’s Register Energy carried out a visual inspection of the WaveRoller demo device and found the structure in good condition. This successful inspection further demonstrates the commitment Lloyd’s Register Energy is seeing that AW Energy has towards design and build quality,” says Ross Wigg , Vice President Renewables, Lloyd’s Register Energy.

[mappress mapid=”39″]

Press Release; Image: AW Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Marine EnergyOperations & MaintenanceTechnologyVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free