Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Production Starts from Iracema Discovery, Brazil
Subsea

October 15, 2014 · about 12 years ago

Production Starts from Iracema Discovery, Brazil

BG Group announced the early start of production from the Iracema area in block BM-S-11, one of the Group’s and its partners’ significant discoveries in the Santos Basin, offshore Brazil. The Cidade de Mangaratiba floating production, storage and offloading (FPSO) vessel is the first unit deployed o

2 minutes read
  • LinkedIn
  • X
  • Email

BG Group announced the early start of production from the Iracema area in block BM-S-11, one of the Group’s and its partners’ significant discoveries in the Santos Basin, offshore Brazil.

The Cidade de Mangaratiba floating production, storage and offloading (FPSO) vessel is the first unit deployed on the Iracema development and the fourth FPSO to date to have started up across the partners’ interests in blocks BM-S-9 and BM-S-11 in the first phase of development of the pre-salt Santos Basin.

BG Group Chief Operating Officer, Sami Iskander said: “ The start-up of the Cidade de Mangaratiba FPSO marks first production from the Iracema discovery and demonstrates the excellent progress we are making in Brazil. With the Cidade de Ilhabela FPSO starting production by the end of the year, these vessels will add 82 500 barrels of oil per day of capacity net to BG Group.

“Like the Lula and Sapinhoá developments, Iracema enters commercial production only around five years after its discovery. This fast-paced development in the Santos Basin reflects the quality of the reservoir and our ongoing close working relationship with Petrobras.”

The Cidade de Mangaratiba can process 150 000 barrels of oil per day gross and 283 million standard cubic feet of gas per day gross making it the FPSO with the highest production capacity to be brought on in the Santos Basin. Plateau production is expected in 2016.

The oil produced from Iracema is high quality and of medium density (30° API). Gas not used for reinjection will be transferred to shore through the Santos Basin pipeline system.

BG Group has a 30% interest in block BM-S-9 (Petróleo Brasileiro S.A., operator, 45% and Repsol Sinopec Brasil 25%). BG Group also has a 25% interest in block BM-S-11 (Petróleo Brasileiro S.A., operator, 65% and Petrogal Brasil 10%).

[mappress] Press Release, October 15, 2014; Image: Schahin

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni gets the ball rolling on execution of Mediterranean gas project
  2. 2Reach Subsea and Eidesvik's 2009-built IMR vessel delivered to new owners
  3. 3Tight reservoirs on Equinor and Aker BP’s agenda amid Norway’s 2.8-billion-boe potential
  4. 4AI solutions to track wildlife at Welsh 30 MW tidal energy project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free