Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Statoil’s Njord A platform up and running again
Fossil Energy

July 21, 2014 · about 12 years ago

Statoil’s Njord A platform up and running again

Statoil resumed oil and gas production on the Njord A platform in the Norwegian Sea on 19 July, after a major reinforcement of the platform structure. Production has been shut down since last summer. Extensive analyses and inspections in 2013 revealed a need to reinforce the Njord A platform structu

2 minutes read
  • LinkedIn
  • X
  • Email

Statoil resumed oil and gas production on the Njord A platform in the Norwegian Sea on 19 July, after a major reinforcement of the platform structure. Production has been shut down since last summer.

Extensive analyses and inspections in 2013 revealed a need to reinforce the Njord A platform structure. To be on the safe side, Statoil opted to keep production shut down until the reinforcements were in place.

“We have extended Njord’s lifetime by improving recovery on the field, and by finding more oil and gas in the area. The Njord A platform has been with us the entire time, and we want to make sure that the structure can withstand the loads it will be exposed to,” says head of Njord operations Arve Rennemo .

The work that has been done through the winter and spring has strengthened the structure, so the platform can resume production. The work of reinforcing the structure has mainly consisted of bracing the primary beams and struts, and increasing the length of the secondary beams under the platform.

The long-range plan is to further bolster the platform to prepare it for future drilling operations and an extended lifetime on the Njord field.

“Njord A will produce oil and gas until the summer of 2016, after which it will be taken to shore for additional upgrades which will allow us to use the drilling system on board, and prepare it for many more good years of service on the Norwegian shelf,” says Rennemo.

Statoil also has studies in progress to assess how the Njord area and the Haltenbanken area in the Norwegian Sea can be further developed. The Njord A platform has been in production since 1997.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Mazarine taking the helm at Black Sea Oil & Gas as Carlyle and EBRD exit
  2. 2CNOOC’s 2026 run powered by 9 start-ups, 5 new oil & gas discoveries, and 23 appraisals
  3. 3Solstad vessel nets two subsea contracts in Asia Pacific
  4. 4Noble rigs’ $560 million drilling gigs push fleet backlog to $6.7 billion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free