Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Trelleborg’s Foam Buoyancy Systems for Shah Deniz Phase II
Subsea

July 17, 2014 · about 12 years ago

Trelleborg’s Foam Buoyancy Systems for Shah Deniz Phase II

Trelleborg’s offshore operation has been awarded a substantial order for its foam buoyancy systems, for the prestigious second phase development of the Shah Deniz field offshore Azerbaijan. Contracted by oil and gas company, BP, Trelleborg will supply a buoyancy package; filled with its high tempera

1 minutes read
  • LinkedIn
  • X
  • Email

Trelleborg’s offshore operation has been awarded a substantial order for its foam buoyancy systems, for the prestigious second phase development of the Shah Deniz field offshore Azerbaijan.

Contracted by oil and gas company, BP, Trelleborg will supply a buoyancy package; filled with its high temperature syntactic foam.

Lee Roskell, Proposals Manager within Trelleborg Offshore and Construction , said: “There is a growing requirement in deepwater applications for flowlines to perform under high temperature and high pressure conditions. Large cyclic changes can cause expansion of the flowline, resulting in lateral or upheaval buckling. And at a depth of 600 meters / 1,968 feet below surface, these flowlines will come under significant force.

“However, Trelleborg buoyancy modules will assist in mitigating this. By reducing the self-weight of the flowline and friction against the seabed, a span of lower resistance is established along the flowline, enabling the buckling to occur in known and controlled conditions.”

With a design life of 30 years, DBMs are typically used between a subsea structure and a surface vessel or platform. A specialist clamping solution securely attaches the DBM assembly to the desired location on a riser, allowing the DBMs to be fitted at any point along the length of the pipeline. The buoyancy segments are assembled to mechanically lock around the clamp and are secured with circumferential straps.

Press Release, July 17, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free