Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Hydro Int. Performs Normandy Hydrographic Survey
Subsea

June 6, 2014 · about 12 years ago

Hydro Int. Performs Normandy Hydrographic Survey

In the summer of 2013, several Hydro International and individuals volunteered to conduct a hydrographic survey off the D-Day beaches of Normandy, France. The first phase of the survey was conducted over the course of 27 days. The purpose of the survey was to collect as much data as possible with mu

1 minutes read
  • LinkedIn
  • X
  • Email

In the summer of 2013, several Hydro International and individuals volunteered to conduct a hydrographic survey off the D-Day beaches of Normandy, France.

The first phase of the survey was conducted over the course of 27 days. The purpose of the survey was to collect as much data as possible with multibeam sonar to create a map of both bathymetry and sidescan data. Throughout the survey the survey lines were adapted as the end neared to ensure that the dataset was complete without any gaps. This required assessing the importance of some areas to determine whether they should be eliminated or preserved.

One aspect of the survey was to locate and identify possible targets that could be missing tanks. Of the tanks launched on D-Day at Omaha beach, 27 of the 29 were lost before they reached the beach. The tanks left the landing craft in deeper water with the intention of propelling themselves to the beach, but rough water conditions resulted in many of them sinking before reaching the objective. Many of the planned lines running parallel to the beach were in excess of 40 kilometres long. The line spacing was 140 metres with the sonar set on an 80 metres range scale.

Press Release, June 06, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & MaintenanceResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free