Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›PRM Setup on Snorre and Grane, Work Continues
Subsea

May 30, 2014 · about 12 years ago

PRM Setup on Snorre and Grane, Work Continues

Installation of the system for permanent reservoir monitoring (PRM) on Statoil’s fields, will move forward with installing a seismic streamer on Snorre. A dedicated system with a seismic streamer will also be installed on Grane. This work is scheduled for completion in early winter 2015. While the c

1 minutes read
  • LinkedIn
  • X
  • Email

Installation of the system for permanent reservoir monitoring (PRM) on Statoil’s fields, will move forward with installing a seismic streamer on Snorre. A dedicated system with a seismic streamer will also be installed on Grane.

This work is scheduled for completion in early winter 2015.

While the cable is exposed on the seabed, before it is covered, it will be highly vulnerable to any external influence. Trawling activity should be avoided in this area during this period.

Permanent reservoir monitoring involves permanently installing a streamer on the seabed to provide a more frequent and better-quality seismic picture of changes in the reservoir. The cable will be used to acquire more knowledge about the reservoir, and thereby provide an opportunity to produce more oil.

Installation of the system will involve laying the cable on the seabed before it is trenched or covered with rocks to make it trawlable.

On the Snorre field, the cable will be laid using the vessel Havila Phoenix, and the trenching will be operated from the Northern Wave. On the Grane field, the vessel Olympic Zeus will both lay and bury the cable.

The fields are operated by Statoil. The Snorre field is located in blocks 34/4 and 34/7 in the North Sea. Water depth in the area is approx. 300-350 metres. The Grane field is located in block 25/11. Water depth in this area is about 130 metres.

Press Release, May 30, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Mazarine taking the helm at Black Sea Oil & Gas as Carlyle and EBRD exit
  2. 2CNOOC’s 2026 run powered by 9 start-ups, 5 new oil & gas discoveries, and 23 appraisals
  3. 3Solstad vessel nets two subsea contracts in Asia Pacific
  4. 4Noble rigs’ $560 million drilling gigs push fleet backlog to $6.7 billion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free