Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›DONG Energy Halfway Through Borkum Riffgrund 1 Foundation Installation
Subsea

May 23, 2014 · about 12 years ago

DONG Energy Halfway Through Borkum Riffgrund 1 Foundation Installation

DONG Energy is well on its way with the construction of the first German offshore wind farm, Borkum Riffgrund 1 in the North Sea. After nine months of construction work, things are now moving fast. On Friday, 16th May 2014, the team completed the first half of the foundation installation when they i

1 minutes read
  • LinkedIn
  • X
  • Email

DONG Energy is well on its way with the construction of the first German offshore wind farm, Borkum Riffgrund 1 in the North Sea.

After nine months of construction work, things are now moving fast. On Friday, 16 th May 2014, the team completed the first half of the foundation installation when they installed monopile foundation and transition piece number 39 of 78 positions in total.

“The team is doing an excellent job offshore,” says Andrew Cotterell, Programme Director for Borkum Riffgrund 1 . “The foundation installation depends upon the weather conditions and fulfilling the stipulated noise levels. Waves and wind can reduce progress. The whole team has performed extremely well to optimally use all weather windows. I’m very proud that they have kept us right on schedule.”

Borkum Riffgrund 1 offshore wind farm has a total capacity of 312 MW and is located in the German North Sea, 37 km north of the island Borkum. 77 foundations are monopiles with transition pieces, the 78 th position consists of a Suction Bucket Jacket, which will be installed for the first time in an offshore wind farm. The installation of the wind turbines will begin in summer 2014.

Press Release, May 23, 2014; Image: borkumriffgrund1

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Mazarine taking the helm at Black Sea Oil & Gas as Carlyle and EBRD exit
  2. 2CNOOC’s 2026 run powered by 9 start-ups, 5 new oil & gas discoveries, and 23 appraisals
  3. 3Solstad vessel nets two subsea contracts in Asia Pacific
  4. 4Noble rigs’ $560 million drilling gigs push fleet backlog to $6.7 billion

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free