Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›MBARI Brings Up Benthic Rover Three Years After Deployment
Subsea

May 1, 2014 · about 12 years ago

MBARI Brings Up Benthic Rover Three Years After Deployment

MBARI has recovered the Benthic Rover for maintenance, after three years of nearly continuous deployment on the seafloor at Station M, located about 220 kilometers off the coast of central California, at a depth of 4,000 meters. The Rover was built by a team of MBARI engineers and scientists, led by

1 minutes read
  • LinkedIn
  • X
  • Email

MBARI has recovered the Benthic Rover for maintenance, after three years of nearly continuous deployment on the seafloor at Station M, located about 220 kilometers off the coast of central California, at a depth of 4,000 meters.

The Rover was built by a team of MBARI engineers and scientists, led by Ken Smith and Alana Sherman, to measure oxygen consumption of benthic, or seafloor, organisms as a way to understand the supply and demand of carbon in the ocean’s deepest waters. While the rover drives to each new site, built-in cameras survey the area and capture images of the seafloor.

Two respirometer chambers are inserted a few centimeters into the sediment to measure the amount of oxygen consumed by the organisms contained in the chamber. The respiration rate helps scientists approximate the amount of food (carbon) the seafloor community is consuming. These data combined with those measured with other nearby instruments will help scientists understand how climate change affects the ability of seafloor organisms to obtain food in the deep ocean.

Moving parts, along with cables and connectors, will be serviced or replaced as needed. One of the most important upgrades is the installation of a redesigned hibernation board that conserves battery power in the field. The Benthic Rover will be redeployed in October.

MBARI , May 01, 2014; Image: MBARI

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cheniere to fuel QatarEnergy with US Gulf Coast LNG through 2054
  2. 2Saipem and Egypt’s MDC seal pact to target MENA offshore drilling market
  3. 3FEED job for Barents Sea FPSO topsides goes to Aibel
  4. 4Cook Inlet LNG steps up Alaska energy push with TDI-Brooks survey

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free