Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Edvard Grieg jacket sailing to North Sea location
Fossil Energy

April 16, 2014 · about 12 years ago

Edvard Grieg jacket sailing to North Sea location

An offshore jacket completed two weeks ago at Kvaerner’s Verdal yard, yesterday left the yard and is now on its way to be installed in the Norwegian North Sea. The jacket, destined for the Lundin Petroleum-operated Edvard Grieg field, weighs 14 500 tonnes. The jacket will stand up 134 metres in vert

2 minutes read
  • LinkedIn
  • X
  • Email

An offshore jacket completed two weeks ago at Kvaerner’s Verdal yard, yesterday left the yard and is now on its way to be installed in the Norwegian North Sea.

The jacket, destined for the Lundin Petroleum-operated Edvard Grieg field, weighs 14 500 tonnes. The jacket will stand up 134 metres in vertical position.

With this delivery, Kvaerner Verdal has delivered 41 jackets during the past 42 years.

The contract for the construction of the jacket was awarded to Kvaerner by the Swedish oil company Lundin Petroleum in January 2012. The jacket will be installed in circa 110-115 metres water depth within the Norwegian Sector of the North Sea, at the Edvard Grieg field.

Kvaerner is also building a topside for the Edvard Grieg project.

First production in 2015

The Edvard Grieg field is an oil field located in the North Sea. First production is expected in late 2015, with a forecast gross peak production of approximately 90.000 barrels of oil per day (bopd). The oil will be processed and transported in a new pipeline to the Grane area and further via the Grane oil pipeline to the Sture terminal for offloading.

Lundin Norway AS is the operator and has a 50 percent working interest in the Edvard Grieg field. The facilities on the Edvard Grieg platform will be prepared for power from shore when capacity and technical solutions are available in order to contribute to the development of a long term electrification of the area. The platform will be Lundin Petroleum’s biggest ever, and their first on the Norwegian Continental Shelf.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni gets the ball rolling on execution of Mediterranean gas project
  2. 2Reach Subsea and Eidesvik's 2009-built IMR vessel delivered to new owners
  3. 3Tight reservoirs on Equinor and Aker BP’s agenda amid Norway’s 2.8-billion-boe potential
  4. 4AI solutions to track wildlife at Welsh 30 MW tidal energy project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free