Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›BLG: Technology Leadership trough Innovation
Offshore Wind

March 7, 2014 · about 12 years ago

BLG: Technology Leadership trough Innovation

The construction of the first offshore wind farms in the German North Sea represents pioneering achievements. In addition to a suitable port infrastructure, handling equipment, specialized ships and technical personnel, new logistics concepts were needed. The dimensions and weight of the components,

1 minutes read
  • LinkedIn
  • X
  • Email

The construction of the first offshore wind farms in the German North Sea represents pioneering achievements.

In addition to a suitable port infrastructure, handling equipment, specialized ships and technical personnel, new logistics concepts were needed. The dimensions and weight of the components, as well as the large distances of the wind farms from the shore and water depths of over 40 meters presented new challenges.

According to a recent study, German offshore wind industry is a leader in the field of innovation and holds 65 percent of all patents.

BLG has developed innovative logistics solutions for the industry at early stages, which were also applied for a patent. For example, the special pontoon OFFSHORE BHV 1 was developed for the transport of heavy load components. Among other things, the pontoon has a load securing system that eliminates the need for welding work, thus contributing to cost savings and at the same time protecting the environment.

BLG also has a pending patent for the load carrier system “the Sleeper”. The Sleeper distributes the heavy loads of the offshore components effectively on the ground. This allows for flexible handling of the components while cutting costs at the same time.

BLG estimates that the offshore wind development with the innovative solutions can save up to 50 percent on costs when compared to conventional solutions.

Offshore WIND staff, March 7, 2014; Image: BLG

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindResearch & Development

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Perenco brings ‘complex’ North Sea P&A and infrastructure removal campaign to an end
  2. 2LNG Canada entrusts Técnicas Reunidas with €200M+ EPCM deal
  3. 3FERC comes up with three-tiered fast track plan to streamline US LNG permitting
  4. 4EU backs cross-border CO2 transport and storage project with €223 million

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free