Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›2H Offshore Designs Lightweight Conductor Supported Tripod Platform for DP
Subsea

February 11, 2014 · about 12 years ago

2H Offshore Designs Lightweight Conductor Supported Tripod Platform for DP

2H Offshore, an Acteon company, was appointed by Dubai Petroleum (DP) to deliver an intensive, fast track design of an ultra-lightweight conductor supported tripod platform. The tripod platform, known as T-02, has been successfully installed in the Fateh field, offshore Dubai in 50m water depth. The

2 minutes read
  • LinkedIn
  • X
  • Email

2H Offshore, an Acteon company, was appointed by Dubai Petroleum (DP) to deliver an intensive, fast track design of an ultra-lightweight conductor supported tripod platform.

The tripod platform, known as T-02, has been successfully installed in the Fateh field, offshore Dubai in 50m water depth. The platform consists of a minimal topside and subsea structure and hosts an exploration well during an upcoming drilling and well test campaign.

As part of the T-02 platform project, 2H Offshore investigated a wide range of development options to facilitate the exploration well for DP before ultimately proving the conductor supported tripod as the most economical and technically feasible solution.

The tripod is designed for installation from a jack-up drilling rig, enabling drilling to commence directly after installation. Leading the detailed design, 2H Offshore undertook the structural design of the subsea template, conductors and topside brace structure while liaising with DP on the access platform and other structural details.

“We carefully assessed the client’s design brief and developed a solution that considered the in-service functional requirements as well as the installation constraints. With the combined knowledge and experience of the DP and 2H teams, we were able to deliver an efficient design in-line with the client’s demanding fabrication and installation programme,” said 2H lead engineer, Graham Nicholson .

“We have a dedicated team of highly skilled engineers and continue to support DP with its future requirements,” added Nicholson .

Press Release, February 11, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free