Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Thames Water Utilities Seeks Contractor for Tideway Tunnel Project
Subsea

January 17, 2014 · about 12 years ago

Thames Water Utilities Seeks Contractor for Tideway Tunnel Project

Thames Water Utilities Limited is seeking for a contractor to perform bathymetric river bed surveys for the Thames Tideway Tunnel Project. The scope of work includes the baseline bathymetric surveys to be conducted for a period of approximately eighteen months prior to the start of river based const

2 minutes read
  • LinkedIn
  • X
  • Email

Thames Water Utilities Limited is seeking for a contractor to perform bathymetric river bed surveys for the Thames Tideway Tunnel Project.

The scope of work includes the baseline bathymetric surveys to be conducted for a period of approximately eighteen months prior to the start of river based construction activities to establish a baseline.

The bathymetric surveys are to be conducted on a quarterly basis, around the time of the equinoxes along the river and at 10 specific sites (7 construction sites and 3 barge handling facilities).

In the 18 month period one whole river survey comprising a full width river bed survey along the river from Chiswick Eyot to Greenwich Pier and 5 site specific river surveys comprising local surveys in the vicinity of each of the identified foreshore sites shall be completed.

Bathymetric surveys shall be carried out using multi-beam sonar and laser scanning techniques recording the data in digital format to both the project grid and the project datum, OS National Grid co-ordinate system and using a format acceptable to the Port of London Authority.

Surveys are to include 3D laser scanning of intertidal areas and photographic records.

High definition 360 degree digital panoramic photography integrated with the laser scanning equipment shall be undertaken.

Thames Water Utilities Limited’s project has a value of £750,000, (ovdje ubaci iznos i u dolarima)and it is expected to be completed 18 months from the date of contact award.

The deadline for expressions of interest for the project is January 23, 2014.

Subsea World News Staff, January 17, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Rig incident: 110 rescued, 5 still missing after Borr Drilling’s jack-up sinks off Gabon coast
  2. 2Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  3. 3DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  4. 4Natural gas discovery springs up in India’s shallow waters

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free