Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Successful Long Term Drill Stem Test at Diega I-8ST Well (Equatorial Guinea)
Subsea

January 8, 2014 · about 12 years ago

Successful Long Term Drill Stem Test at Diega I-8ST Well (Equatorial Guinea)

The long term drill stem test on the Diega accumulation in Block I, Equatorial Guinea (PA Resources 5.7%) is now complete and the Atwood Hunter rig has been released. An initial pilot well, I-8, encountered 12 m vertical thickness of good quality oil pay with no water and so established the deepest

2 minutes read
  • LinkedIn
  • X
  • Email

The long term drill stem test on the Diega accumulation in Block I, Equatorial Guinea (PA Resources 5.7%) is now complete and the Atwood Hunter rig has been released.

An initial pilot well, I-8, encountered 12 m vertical thickness of good quality oil pay with no water and so established the deepest known oil on the Diega accumulation. Subsequently the planned horizontal sidetrack I-8ST drilled some 400m of oil pay of similarly good quality and was tested for one month at constrained rates up to approximately 7,300 barrels of oil per day.

The well has been suspended for re-use as a future production well. The test confirmed lateral reservoir continuity and absence of reservoir compartmentalisation and will permit the submission in 2014 of a plan of development for Diega as a subsea tieback to the Aseng FPSO, targeting first oil in 2016.

Mark McAllister, PA Resources’ CEO comments: “This is an excellent result in every respect; well productivity, reservoir quality, field continuity and the size of the accumulation. We indicated in 2013 that we expected a near term field development in Block I, conservatively of the order of 30 million barrels. However initial interpretation of these well results is consistent with our expectations of significantly larger reserves and further Diega drilling is likely in Block I, where the down-dip limit of the field has yet to be established. An early Diega development is facilitated by the existing infrastructure in Block I, and we expect that any development will be expandable to accommodate additional reserves identified during further appraisal drilling”.

Press Release, January 08, 2014; Image: Oil Rig Photos

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Woodside passes the baton for offshore gas project to Timor Gap in $200 million deal
  2. 2Fugro wins UXO survey contract for German offshore grid connections
  3. 3Accelerating operational excellence in offshore energy
  4. 4Go-ahead for North Sea wildcat clears path for Equinor’s drilling ops with COSL rig

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free