Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›IKM Awarded Contract by PT McDermott Indonesia for Kepodang Gas Field Project
Subsea

September 30, 2013 · about 13 years ago

IKM Awarded Contract by PT McDermott Indonesia for Kepodang Gas Field Project

PT IKM Indonesia has been awarded a contract by PT McDermott Indonesia for the Kepodang Gas Field Project. McDermott won the contract from PC Muriah, which is an affiliate of PETRONAS Carigali. Under this contract, McDermott will procure, build, install and commission a 5,802t central processing pla

1 minutes read
  • LinkedIn
  • X
  • Email

PT IKM Indonesia has been awarded a contract by PT McDermott Indonesia for the Kepodang Gas Field Project.

McDermott won the contract from PC Muriah, which is an affiliate of PETRONAS Carigali. Under this contract, McDermott will procure, build, install and commission a 5,802t central processing platform and a 1,298t wellhead platform.

The Muriah PSC currently covers an area of approximately 2788 square kilometers in the East Java Sea. Cities Service originally discovered gas in 1971, and subsequent wells drilled by Conoco in 1981 and Shell in 1993 encountered same gas accumulation, now known as the Kepodang field. The Kepodang field is located about 180 km north east of Semarang, the capital of the Province of Central Java, in water depths ranging from 60 to 70 meters. Kepodang Gas Field is shown below.

The Scope of Subcontract Services including Project management, provision of labor, equipment and consumables to carry out the following services:

a. Flange Management

b. Valve Leak Testing

c. Chemical Cleaning

d. Hot Oil Flushing

e. Hydraulic Tuding

Flushing

f. Nitrogen Helium Leak Test

Project is scheduled to commence in October 2013 over a period of 10 months in Batam, Indonesia.

Press Release, September 30, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production, PTSC cheer FSO’s first oil at Southeast Asian project
  2. 2DOF opts to sell 2018-built subsea vessel as attractive offer emerges
  3. 3Natural gas discovery springs up in India’s shallow waters
  4. 4Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free