Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Otto Energy Continues Galoc-5H Well Drilling (Philippines)
Fossil Energy

September 4, 2013 · about 13 years ago

Otto Energy Continues Galoc-5H Well Drilling (Philippines)

Otto Energy Limited, as operator of the producing Galoc oilfield joint venture offshore the Philippines, provides the following update on the Galoc-5H and Galoc-6H drilling campaign in SC14C, part of the Galoc Phase II development approved in 2012. During the period from 0600 hours (AWST) on 28 Augu

2 minutes read
  • LinkedIn
  • X
  • Email

Otto Energy Limited, as operator of the producing Galoc oilfield joint venture offshore the Philippines, provides the following update on the Galoc-5H and Galoc-6H drilling campaign in SC14C, part of the Galoc Phase II development approved in 2012.

During the period from 0600 hours (AWST) on 28 August 2013 to 0600 hours (AWST) on 4 September 2013, drilled the G-5H well 8½” hole horizontally from 2,700 metres to 3,526 metres. Results obtained from drilling logs indicate that the well is delivering in line with the pre-drill prognosis.

The forward plan is to continue drilling the G-5H well 8½” hole horizontally through the reservoir interval and run the completion liner and assembly.

Location and Proposed Depth

The Galoc field is located in Service Contract SC14C (Galoc Sub Block) in 290 metres of water approximately 65km North West of Palawan Island and 350km south of Manila in the Republic of the Philippines. The Galoc-5H and Galoc-6H development wells are being drilled within the existing producing field that has delivered over 10 MMbbls of production since the field was commissioned in 2008.

The Galoc-5H and Galoc-6H development wells will be drilled to a total vertical depth of 2,190 metres with approximately 2,000 metres of horizontal completion. Drilling is expected to take approximately 115 days including the flowing of the wells for clean-up.

After drilling of both Galoc-5H and Galoc-6H is completed, the DOF operated Skandia Hercules construction vessel will be used to install the subsea equipment and complete the hook-up of both wells to the FPSO Rubicon Intrepid.

First oil from the Phase II wells is expected in November 2013.

[mappress]

Press Release, September 04, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni, PTTEP forge JV to consolidate stakes in ADNOC’s giant offshore sour gas asset
  2. 2Malaysian survey services firm enters collaboration in Indonesia and Timor-Leste
  3. 3Cheniere to fuel QatarEnergy with US Gulf Coast LNG through 2054
  4. 4Saipem and Egypt’s MDC seal pact to target MENA offshore drilling market

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free