Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Allseas Wins Removal Contracts for Shell’s Brent Platform, UK
Subsea

August 15, 2013 · about 13 years ago

Allseas Wins Removal Contracts for Shell’s Brent Platform, UK

Shell U.K. Ltd has awarded the Swiss-based Allseas Group S.A. the contract for the removal, transportation and load-in to shore of the topsides of three of its Brent platforms, with an option to do the same with the fourth platform. The contract also includes the removal of Brent Alpha’s steel jacke

1 minutes read
  • LinkedIn
  • X
  • Email

Shell U.K. Ltd has awarded the Swiss-based Allseas Group S.A. the contract for the removal, transportation and load-in to shore of the topsides of three of its Brent platforms, with an option to do the same with the fourth platform.

The contract also includes the removal of Brent Alpha’s steel jacket.

The Brent field is situated on the UK Continental Shelf, 186 km (116 miles) north-east of Lerwick, Scotland, in a water depth of 140 m (460 ft). The field comprises four large platforms: Alpha (a steel jacket), Bravo, Charlie and Delta (concrete gravity-based structures), with topside weights ranging from 16,000 to 30,000 t.

Removals begin with Brent Delta in 2015/16, and the remaining topsides over the ensuing eight years with dates to be confirmed.

The Brent contract is the first to be awarded to Allseas for Pieter Schelte, Allseas’ dynamically positioned single-lift installation/decommissioning and pipelay vessel, which is currently under construction at Daewoo Shipbuilding and Marine Engineering (DSME) in Okpo, Korea.

Pieter Schelte, with a length of 382 m and width of 124 m, will have a topsides lift capacity of 48,000 t and a jacket lift capacity of 25,000 t.

[mappress]

Press Release, August 15, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceOperations & MaintenanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Saipem and Egypt’s MDC seal pact to target MENA offshore drilling market
  2. 2FEED job for Barents Sea FPSO topsides goes to Aibel
  3. 3Cook Inlet LNG steps up Alaska energy push with TDI-Brooks survey
  4. 4Nexans, Red Eléctrica to tie Mallorca and Menorca closer with new Balearic power link

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free