Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›LUKOIL Assembles Supporting Blocks for Caspian Sea Platform
Fossil Energy

July 11, 2013 · about 13 years ago

LUKOIL Assembles Supporting Blocks for Caspian Sea Platform

LUKOIL has launched assembly of supporting blocks for the ice-resistant stationary platform located at Vladimir Filanovsky field in the Caspian Sea. The supporting blocks will be attached to the seabed by means of twenty piles, each with a diameter of more than 2 meters. The piles will be hammered i

2 minutes read
  • LinkedIn
  • X
  • Email

LUKOIL has launched assembly of supporting blocks for the ice-resistant stationary platform located at Vladimir Filanovsky field in the Caspian Sea.

The supporting blocks will be attached to the seabed by means of twenty piles, each with a diameter of more than 2 meters. The piles will be hammered into the seafloor up to 60 meters deep to ensures secure mounting of the platform, making it resistant against potential extreme ice and wave exposure. The water depth at the assembly point is 7 meters. The combined weight of the two supporting blocks is around 5,000 tons. Each supporting block is 28.3 m long, 23.7 m wide and 16.4 m tall.

The supporting blocks are assembled by means of the Transport and Installation Barge (TIB), which has a crane with a loading capacity of 400 tons. The loading capacity of the TIB is 13,450 tons, it is 140.3 m long and 62.3 m wide. The T-shaped barge comprises one main pontoon and two additional side pontoons (outriggers), which magnify the vessel’s loading capacity and stability when carrying super-heavy large-size cargoes.

This year, LUKOIL plans to install more supporting blocks – for the platform of the living-quarters module, for the central processing platform and for the riser block. In 2014, topside sections will be mounted on the supporting blocks. All of the offshore facilities are manufactured by Astrakhan’s shipbuilding enterprises to orders from LUKOIL.

Commercial drilling at Vladimir Filanovsky field is scheduled to begin in 2014. Oil production is to begin by the end of 2015.

[mappress]

Press Release, July 11, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyBusiness & FinanceProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1SSE taps Seaway7 for Scotland-bound inter-array cables, foundations
  2. 2Infill drilling ops underway offshore Oman with November start-up in sight
  3. 3South Korea's Taihan targets expansion in US and Europe under new CEO
  4. 4Norway set on tapping into Arctic gas potential: New study to unlock 1988 Barents Sea discovery

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free