Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Installation of Permanent Reservoir Monitoring System on Snorre Field Off Norway
Subsea

June 19, 2013 · about 13 years ago

Installation of Permanent Reservoir Monitoring System on Snorre Field Off Norway

From 20 June to 20 October, a seismic streamer will be installed on the Snorre field in the North Sea. Trawling activity in the area should be avoided during this period. During the period when the streamer is lying exposed on the seabed, before it is covered, it is extremely vulnerable to any type

1 minutes read
  • LinkedIn
  • X
  • Email

From 20 June to 20 October, a seismic streamer will be installed on the Snorre field in the North Sea. Trawling activity in the area should be avoided during this period.

During the period when the streamer is lying exposed on the seabed, before it is covered, it is extremely vulnerable to any type of external influence. We therefore urge relevant parties to avoid trawling activity in the area during this specific period. Guard vessels will be present.

Permanent reservoir monitoring (PRM) is a project wherein streamers are permanently laid on the seabed so as to provide better and more frequent seismic imagery of changes in the reservoir. The streamer is used to obtain more knowledge about the reservoir, thus facilitating the possibility of recovering more oil.

Installation of the PRM system entails the laying of approximately 250 km of streamers on the seabed, before the cable is buried or covered with rock, so that it is trawlable. The streamer will be laid by the Maersk Responder vessel, and the trenching operation will be run from Northern Wave.

The Snorre field is operated by Statoil and is located in blocks 34/4 and 34/7 in the North Sea, northeast of Gullfaks and southwest of Knarr. Water depth in the area is around 300 metres.

[mappress] Press Release, June 19, 2013; Image: Statoil

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petronas, TotalEnergies and Mitsui to develop CO2 storage area off Peninsular Malaysia
  2. 2Eni, PTTEP forge JV to consolidate stakes in ADNOC’s giant offshore sour gas asset
  3. 3Malaysian survey services firm enters collaboration in Indonesia and Timor-Leste
  4. 4Cheniere to fuel QatarEnergy with US Gulf Coast LNG through 2054

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free