Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Preparations Underway for Turbine Installation at Riffgat Offshore Wind Farm, Germany
Wind Farms

April 9, 2013 · about 13 years ago

Preparations Underway for Turbine Installation at Riffgat Offshore Wind Farm, Germany

Preparations for the installation of wind turbines at the Riffgat offshore wind farm have begun in early April. Transport and loading of heavy components of the Siemens SWT 3.6, such as towers, nacelles, blades and turbines, have been performed with a special installation vessel, the “Bold Tern” fro

1 minutes read
  • LinkedIn
  • X
  • Email

Normal 0 21 false false false BS-LATN-BA X-NONE X-NONE /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-fareast-language:EN-US;}

Preparations for the installation of wind turbines at the Riffgat offshore wind farm have begun in early April.

Transport and loading of heavy components of the Siemens SWT 3.6, such as towers, nacelles, blades and turbines, have been performed with a special installation vessel, the “Bold Tern” from Esbjerg.

“Bold Tern”, owned by Fred Olsen, is a 132 meter-long and 39 meter-wide vessel with a loading capacity of up to 5,300 tons. It is a jack-up vessel with four extendable raising legs that allow precise positioning in the water.

The legs are around 78 meter-long and can lift the vessel from the ocean floor, thus facilitating precise construction work. The installation vessel is suitable for water depths of up to 40 meters.

The “Bold Tern” has two cranes on the deck, with a maximum tractive effort of 800 tons.

At the beginning of this week, the rotor blades for the first eight wind turbines were loaded. Nacelles and tower components will follow before the vessel departs for the installation for the first time.

[mappress]

Offshore WIND Staff, April 9, 2013; Image: enova

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 122-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  2. 2Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  3. 3Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea
  4. 4Shell’s platform departs for Trinidad & Tobago’s offshore realm as NGC locks in gas from two upcoming projects

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free