Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›ABB Exhibits World-Record Submarine Cable at Hanover Fair, Germany
Subsea

April 8, 2013 · about 13 years ago

ABB Exhibits World-Record Submarine Cable at Hanover Fair, Germany

At the 2013 Hanover Fair, ABB is exhibiting a piece of the world’s highest-rated three-core submarine cable. The AC cable will be installed on the “Little Belt”, the strait between the Danish island of Fünen and the Jutland peninsula, which links the North and Baltic Seas. In conjunction with a 420

2 minutes read
  • LinkedIn
  • X
  • Email

At the 2013 Hanover Fair, ABB is exhibiting a piece of the world’s highest-rated three-core submarine cable. The AC cable will be installed on the “Little Belt”, the strait between the Danish island of Fünen and the Jutland peninsula, which links the North and Baltic Seas.

In conjunction with a 420 kilovolts (kV) land cable system – also on show at the ABB booth – the cable system will there be replacing an overhead transmission line route. This is part of a project initiated by the government to replace overhead lines by cables in ecologically sensitive areas.

In February 2012, ABB received the order from the Danish transmission system operator Energinet.dk to deliver and install this cable system, comprising a total of 30 kilometers (km) of 420-kV single-core underground cables and 15 km in all of the 420-kV three-core cable. Due to the quantity of electricity to be transmitted, there are two submarine cables laid parallely, each of them able to transmit more than 500 Megawatt (MW). ABB is required to supply a turnkey system, i.e. besides design, production and installation of the requisite cables, the company is also responsible for the cable termination and for the sea cable laying of the cables. When the project has been completed, in the autumn of 2013, then it will be the world’s highest-rated three-core submarine cable system.

While on land three single-core underground cables are laid in parallel, three-conductor cables are customarily used for AC submarine cables. This reduces not only the costs for the laying work, but also the amount of space required on the seabed. ABB produces the entire submarine cable in one piece, so that no joints have to be used when laying it. This is possible only thanks to the very sophisticated production processes that are used in the cable factory in Karlskrona, Sweden.

[mappress] Press Release , April 08, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Folegandros island joins Greece’s mainland power grid via 60-kilometer subsea cable
  2. 2UK’s first HVDC subsea cable factory opens in Scotland
  3. 3EU grant to cover 60% of investment for 10 MW tidal kite array in Ireland
  4. 4Eni and Libya’s National Oil Corporation turning on the taps at African gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free