Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Offshore Wind›Three Installation Vessels in Operation at Anholt Offshore Wind Farm (Denmark)
Offshore Wind

February 6, 2013 · about 13 years ago

Three Installation Vessels in Operation at Anholt Offshore Wind Farm (Denmark)

At the beginning of January 2013, the installation vessel Sea Jack arrived at Grenaa Harbour, and a total of three installation vessels are now in operation to exploit the few and often short-term installation windows which the season allows. At the end of February, A2SEA’s new custom-designed insta

1 minutes read
  • LinkedIn
  • X
  • Email

At the beginning of January 2013, the installation vessel Sea Jack arrived at Grenaa Harbour, and a total of three installation vessels are now in operation to exploit the few and often short-term installation windows which the season allows.

At the end of February, A2SEA’s new custom-designed installation vessel, Sea Installer, will arrive to replace Sea Jack which has other tasks to tend to.

Together with Sea Power and Sea Worker, the three installation vessels will continue the installation of wind turbines throughout March before Sea Installer leaves the area in April to take up other tasks in the Irish Sea.

The installation vessels, Sea Worker and Sea Power, will then continue the installation work which is expected to be completed in summer 2013.

At the end of January 2013, 28 wind turbines had been installed in Anholt Offshore Wind Farm; 28 are connected to the grid and 19 have produced electricity.

On 22 January 2013, four installation vessels were gathered in Grenaa Harbour; Sea Power’s sister vessel, Sea Energy, stopped by Grenaa Harbour in connection with the preparation for a maintenance task for Samsø Offshore Wind Farm, and Sea Power, Sea Worker and Sea Jack were waiting for better weather conditions.

[mappress]

Press release, February 6, 2013; Image: DONG Energy

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Offshore WindNews

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1
  2. 2
  3. 3
  4. 4

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free